The rains had no effect on the construction, other than getting everything WET! I did have a few areas to sump pump out, but other than that, once the rains stopped, I started working.
A lot of bracing was added to the shoring, in anticipation of the arrival of the steel joists. We also spent time organizing our stored materials so that the cellar walls could be started. As I continue to create spaces and use materials, this will get easier, but right now we still end up moving materials back and forth to keep them out of the way of what ever we are doing!On Thursday I met with the fabricators of the structural steel posts that will be part of the support system for the floors above. I also had a good meeting with the folks at Precise Air, the company that will be doing our Heating and air conditioning systems. We hammered out some important details, then I headed back to the lot. That afternoon, the steel joists were delivered, and by the end of that day we had placed all of the longest joists up on the shoring.