Sunday, July 13, 2008

Getting ready for the Last Floor - Part 2

One of the things I had the laborers take care of when it was too hot was to clear out the garages.  They had been full to the ceiling of  AmDeck pieces,  but it was time to move them up for use on the kid's bedroom level.  

This also opened up space for new material that I was expecting to arrive shortly.  By the middle of the week the garage was almost cleared,  except for a pile of dirt!  
 
Here are some of the Amdeck forms now piled high in the livingroom!  Still a pile of dirt here too!

The rest of the AmDeck was stacked outside on the livingroom porch and garage roof.


Speaking of dirt,  we started backfilling the south side of the house.  Most of the dirt that was piled behind the house and in the kitchen was moved one bucket at a time to the south side and compacted.
Here is Junior doing some compacting as Kyle shovels more dirt:




I forgot to precast one hole in the footing,  so I rented a coring drill and a few hours later I had a nice clean 5" diameter hole through the 12" thick footing.

Here is the core created by the special drill:


One other hole I forgot to form before filling the wall was the 13" diameter hole for the hood vent in the kitchen. This was a big mistake, because it took the better part of a day for one man to chip it out! Lesson learned!


Once the 5" hole was drilled,  the HVAC guys from Precise Air came and installed the cellar bath vent,  and 2 conduits with insulated copper pipes inside that will eventually go to the condensers that will be located on the south side of the house.



Up on top,  the shoring was almost finished.  The "bridge" running from front to back is the form for a huge structural concrete beam that will support the entire floor above.


On Thursday the steel joists were delivered!  I decided to order the rest of the joists for the house, even though they would be tough to store, so I paid the extra fee to have them forklifted up to the top floor!  Here is the steel on the truck,  with the giant forklift being towed behind.


The driver was able to lift the order in two groups.  Each time we blocked the street while he drove up from his truck and right into the driveway ...  

... then lifted the bundle to the master bedroom level.  


The guys were all up there waiting and as soon as he stopped moving they cut the bundles open and unloaded one piece at a time.  

Part of the order was stacked on the newly built shoring.

The steel for the roof over the master suite was put in place on the shoring, and the rest of the roof pieces were stacked right in the tower room floor!

Here is a movie of the steel delivery process:




Now that the garage was emptied and ready for clean storage,  The guys built some temporary "doors". 
I don't think I ever mentioned the ramp!  A few weeks ago we created a ramp so that we could get to the house without climbing the crazy wood ladders!  The inspectors (and my family) are thrilled with it!


Here are the front steps with the forms removed.  There are not perfectly finished,  but they will be covered!  

On Friday we had a busy morning!   The steel posts were delivered for the kitchen level.  We only had time to carry them up and leave them in the livingroom.
  
The  shoring is not finished,  but it's getting close!  One of my workers said that it looked like the underside of an old wooden rollercoaster!

This is the front edge of the slab looking up at the top of the stairs leading to the kid's bedroom level.

At 10:30 Jose the pumper arrived and started setting up for the pour.  The plan was to backfill the kitchen wall and top off the back footing at the same time so that the crawlspace had a decent floor surface.   The crawlspace is accessed through an opening hidden in the kitchen pantry show here.

The pour went well,  and now there is a concrete floor!  This will also be the surface that the back walls will be built on.

Since it was the Friday of a long hard week,  some of the guys wanted to work only a half day,  so the afternoon was a little slow,  only Evan and one laborer, Tom,  stayed with me.    

Tom worked the rest of the afternoon on the front edge of the form, while Evan and I did some trowelling on the new slab.  Evan also cleaned up the rubbish inside the construction fence at the street. Here is the slab form,  looking down the stairwell from the kid's level.

Here is the tower bedroom as viewed from the middle of the kids level slab.

After work, I dropped off Evan,  then came back up to the house to power wash the street.  Once the street was clean I climbed up to the top of the house to reflect.  I realized that I have not taken any time to stand back and look around by myself!  One thing I noticed was how quiet it was,  even at 5:00 in the evening.  As I was walking around I heard a shuffling sound at the street,  and out walked some of our future neighbors!

We both stood still contemplating each other,  then they walked on by and I packed up and went home.

On Saturday,  Evan came and helped me for a few hours.  I really wanted to lay out some of the AmDeck on the kid's level,  and it was fun having Evan there to assist!

I know I've described how easy the AmDeck installation is.  Here is a little sequence Evan took of me dropping one of the blocks in place.   


After less than an hour of work, we had laid out most of the floor for Evan's bedroom!


Next week I hope to finish all of the forming for the kid's level floor!  

Thursday, July 3, 2008

Getting ready for the Last Floor

In the last few weeks the iron workers at Universal Iron Doors created some of the fun details for the doors.  These rosettes were custom fashioned to my specifications,  based on an existing historical rosette design.   

The transom frame is taking shape too.  soon it will be welded to the door frame.

Back on site,  now that the Kitchen walls were filled,  we started prepping for the last of the floor levels,  the Kid's bedroom level.  This is the largest slab to be poured yet and includes the 2 kid's bedrooms,  the kid's den and bathroom,  a guest bedroom and bath,  and the laundry room.

First,  the rear footing needed to be cleared and prepped for the short walls that support the back section of this slab.


The dirt that was being stored in the diningroom and kitchen floors was moved to the back crawlspace to get ready to backfill.  



Evan worked a hard, hot day shoveling with the laborers!


More to report from my iron door company. Towards the end of the week, Sam called me and said that the transom was finished! When I got there I saw almost complete doors with all of the iron detail!


Laying on sawhorses was the complete frame with the transom attached. The guys all got together to raise it up, but it was too tall for the workshop!


Here is a closer view of the transom. It was so much fun designing iron work, I plan on doing a lot more in the future!



Saturday, June 21, 2008

Kitchen Walls, Done!

Only 3 weeks has passed! I'm getting better !  Progress to report,  both on site and off.  First,  let me report the exciting developments from off site.

Tikal Doors, the manufacturer I chose to build all of my exterior and interior doors and windows reported to me that they are almost done!  The craftsmen in Guatemala who are creating the doors have almost finished their work and are starting to pack them in the shipping container for the long journey to Glendale. 

 I chose this company because of the quality of their work and because they would create the entire door to my exact specifications,  pre-hang it in it's frame, and then do a very fine finish.  All I will need to do is move them into place and attach them to the walls!  

My other important door is the main entry.  Originally I had designed a custom wood door topped with a half round transom window with wrought iron.  Since starting construction,  we were introduced to the idea of an iron entry door.  There are a number of companies that manufacture very elaborate doors in China or Mexico,  but they were all too ornate for me,  and besides,  I wanted something that was one of a kind.  I designed an arch-topped iron door that would take the same overall shape as the original doors and transom,  but the city felt that I should stick with the flat topped doors and separate transom,  so I designed this custom iron door:  


I found a local shop to create the door and they started forming the doors this month.  Here is the jamb and door frames taking shape.


It's a lot of fun going into the shop and seeing something I designed being created out of metal! I am talking to the same company about doing all of my wrought iron railings too!

Now to the onsite progress!

We had a very exhausting but productive pour on Friday, June 20.  It was so exhausting that I don't have any pictures of the action until things started calming down!  Why was it so exhausting?  I had no slabs to do so I didn't hire the finishers,  but I had plenty of laborers to help out.  What really made the day difficult was the weather!  I was not able to get the trucks to arrive earlier that 11:00 am, and by that time the heat had really built up!  It reached a record 106 degrees in Glendale,  and it FELT like it!  

I had a new pumper, Alex,  a friend of Jose, my regular pumper.  He arrived an hour early and set up, running hoses all the way up behind the kitchen walls.  When the first truck arrived we started by filling the last footing,  the one behind the kitchen that would support the back wall of the kid's bedroom wing.  After that was filled,  (about 1.5 trucks full!)  we started with the back wall of the garage.  I filled the first few feet then moved over,  continuing until the entire room was filled just a few feet high,  then started back at the beginning and filled a little more at a time until it was finished.  

Most of the day I was up on a 10 foot ladder with the 3" concrete hose on my shoulder,  and looking down into the wall so I could see how far it was filling.  I had another guy on a second ladder or on the ground with the vibrator,  and Alex the pumper stayed with me,  helping hold the weight of the hose up.  It was still very heavy,  and the heat on my back was magnified by the heat generated from the curing concrete that was blasting up out of the walls into my face!  It was so extreme just being in the sun that some of the laborers kept retreating into the shade and I had to keep yelling to get them out to help me!

Finally, the walls were finished!  As the hose was pulled out we filled the single step from the foyer to the living-room and the front porch.   The laborers did their best to level out the porch and steps while I pumped,  but the sun was so brutal that it started to set up before they were finished.  

Soon, the last truck was emptied.  I actually calculated so closely that there was less than half a cubic yard in the truck!  I then started doing what I could to finish the porch and steps.  By this time the laborers had almost all gone,  I had staggered a few of the guys so I would not be alone at the end.  I'm glad I did that,  I needed help all the way through!

Here I am,  battered and tired,  but glad to be finished with this grueling day! 


The next day was Saturday, so Evan and I came by a few times just to moisten the fresh concrete since it was still so hot!


Here is the first step up from the foyer to the living-room.  I will pour the next 2 steps on a subsequent pour.  


Here is the back footing.  It's another huge hunk of concrete,  but I didn't take the time to fiish the top.  Since it is going to be a crawl space for utilities,  I will do a smoth and level slab on top on the next pour.


And finally, the new steps up from the cellar level to the front porch!  It was nice to get these done,  now for the first time, we can walk up the ramp and these steps and get into the house without using a rickety old ladder!


They may not be perfect because the sun set them so quickly,  but they will be covered eventually,  so I am not concerned about that!

What a pleasure to easily walk up to the house now!  


Next step,  the kid's bedroom level floor!





Wednesday, June 18, 2008

Progress in Many Areas!

There is progress to report in a few areas!  First,  as the walls continued to rise above the kitchen floor,  I couldn't put off any longer the difficult job of removing the forms under the kitchen floor!  One of the laborers, Sid,  spent a good part of a day cutting and removing the temporary shoring lumber.  This was difficult because of the cramped situation, but also because there is a narrow gap at the entrance so all of the lumber needed to be cut to short lengths!  What a trooper!


Outside,  the sewer line was finally connected and ready to bury!  Here it is at the house side with a clean-out visible:


Right in the middle of the driveway there is another clean-out,  then it drops down to the level of the "lateral" the pipe set under the street to my property line:

Here is the test plug in place on the right,  and the fitting that connects my 4" plastic pipe to the city's 6" clay lateral.  The test plug inserts in the fitting, then is inflated until it closes off the pipe. Then I could fill the entire line to test for leaks.  There weren't any!

I passed that inspection and compacted the dirt on top,  then trenched across it to set the electrical conduit in.  It runs from the pull-box already in place...


... to the permanent service meter location between the garages.

I also placed drywall in the back top of the garage.  After it was inspected I taped and painted it to get ready for the HVAC unit.

The next day the guys from Precise Air came with the equipment,  set some hanger hardware into the concrete,  then we all lifted the unit onto the hangers.


This is one of two HVAC units.  It will service the cellar and 1st floors.  The second unit located in a crawlspace behind the kitchen,  will take care of the 2nd floors.


I also started forming the front porch outside of the main entry.



This week we also finished forming the kitchen walls up to the point where the ceiling would be set.



After building the window bucks,  we will be ready to finish the 1st floor walls!


Onward and Upward!

Saturday, May 31, 2008

Kitchen Walls

Another month has passed since my last entry!  I guess I should give up on my weekly update concept! 

 Last week the walls started to rise on the Kitchen / Family room level.  

First we had to spend a few days carving the rock back so there would be room not only for the walls,  but enough room to do the waterproofing.  This created yet another pile of dirt!

With no place to put the dirt permanently,  we had to pile it in the middle of the diningroom floor!  My plan is to pour the kitchen/greatroom walls first,   then waterproof,   then lift the dirt over the wall.      
The window in the family room is just starting to take shape.  It will be a nice view!

The rough electrical work in the livingroom and cellar is almost complete.  After just a few days of work, Bill from Blue Fields Electric got all of the boxes and wiring set into the walls.   

On a traditionally wood framed wall,  the boxes are nailed to the studs and holes are drilled in each stud,  allowing the wire to be run through the walls from box to box.  In ICF construction,  I cut channels in the foam with a "hot wire"tool,  then the boxes are attached to the concrete core.  The wires are run in the channels to,  then held firmly in the channel by little squirts of spray foam.
The electrical went pretty easily, once we got the hang of it!



At the end of the week I had a nice visit from some of our out-of-town family!



Saturday, May 24, 2008

Kitchen Slab, Done!

Before I get to the most recent pour day,  I want to detail the amazing quantity and variety of inspections I have on this project!  Here they are, not in any particular order:

PRIVATE INSPECTORS
Geologist:  This private inspector must approve each excavation and every trench I cut,  before the steel is laid and the footings are poured. He also inspects vertical cuts in the hill for stability.  This is a representative of the company that did my original Soils Report.

Structural Observation:  Every time I install reinforcing steel (rebar) and before I have the city inspector come,  I am required to have this licensed engineer inspect my work.  He is basically acting as a representative of the original design engineer,  who would normally do these inspections,  except for the fact that my engineer is located in Oregon!  He reviews the structural plans and makes sure I have done everything as designed.

Compaction Inspector:  This is another private inspector working for the Geologist. He inspects and tests the compacted soil (See entry on April 24, 2008).  He also inspects the French Drains before retaining walls are backfilled.

Deputy Inspector:  This private inspector is present whenever I am pouring the high strength 3000 psi concrete.  His job is to make sure the concrete is placed as designed by the structural engineer,  so that full strength will be achieved.  He also takes samples of the concrete right from the concrete truck which are tested by at laboratory for strength at 7 days,  and then at 28 days.  The concrete must reach a certain percentage of it's full design strength before I can take off the shoring,  and must reach the full 3000 psi by 28 days.  So far,  my tests have all gone very well,  in some cases my samples have surpasses the full design strength by the 7 days!

CITY INSPECTORS
Grading Inspector:  This representative from Public Works Department inspects all excavations and french drains after the Geologist has done his inspections.  He is also concerned with making sure that the cut slopes are properly protected from erosion during the rainy season, and that no run-off will end up on the public roadways.  He will also give final approval to all grading and site drainage to make sure it is safe and conforms with codes.

Electrical Inspector:  Pre inspects all electrical work.

Mechanical Inspector: Pre inspects all HVAC ducting and equipment.

Plumbing Inspector: Pre inspects all plumbing work.

Building Inspector: After all of the other inspectors have made their reports, the Building inspector must visit, review the other's reports,  and sign off.  

Only after ALL of these inspections can I proceed to the next step!

Then,  when I am at a certain stage,  my City Planner who helped me through the Design Review process will do a site inspection to make sure I am building what was approved. When I am all finished I will need sign-offs from just about all of them before I get the Certificate of Occupancy,  but that is still a little while off!  I don't want to get too far ahead of myself!

Back to the current stage, the Kitchen Slab!

When all the steel was placed, I called for my structural observation inspection last Friday.  That went well,  so I called for the building and plumbing inspection.  Well,  I thought I was ready to pour!  I had to redo the tiny bit of plumbing that would be buried by the concrete,  but that was a quick change,  and I passed inspection on Tuesday.  Here is the island sink vent:

 I also got the ducting inspected and approved,  so on Wednesday the Building Inspector came by and approved me.  On Thursday,  we had a relaxed morning getting ready for the pour.  The first truck arrived at 11:00 and everything went very well! The forms all held without any leaks,  and the finishers helped all along the way making the pour very successful.  Then,  just as the last truck left and the finisher were about to do their final pass,  the clouds broke open and there was a huge downpour! 

 I stood there watching as the nice smooth finish got pockmarked by the huge drops of rain!



Oh Well!  It really doesn't matter, because it will all be covered by the finished floor material,  but the finishers were disappointed that they couldn't leave it as perfect as usual.  During a break in the storm I tried to put plastic down to protect as much slab as I could.


On Friday it rained off and on most of the day,  so I took time driving around town and making some decisions!  I ordered the Iron Entry Door,  and discussed the huge amount of iron railings that will need to be fabricated.  I also visited a members only flooring supplier and found some really nice options.

On Saturday Morning Kyle and his girlfriend Annette came and worked with me for a few hours.  We moved a bunch of the bags of ICFs,  making room to start building walls.  

Then, while I measured and set the metal channel that would align the first course of ICFs,  Kyle and Annette started building ICFs. 



It was really great having them help out!  This afternoon Jeanne and Evan also came by to tour the house,  and it was wonderful to walk them around and have them get excited about it!  What a great family I have!

Next week we build lots of walls!