Saturday, February 2, 2008

Living-room Walls, continued...

By the end of last week,  I did indeed have the living-room walls up,  and most of the major shoring in place.  The rains had no effect on the construction,  other than getting everything WET!  I did have a few areas to sump pump out,  but other than that,  once the rains stopped, I started working.   

A lot of bracing was added to the shoring,  in anticipation of the arrival of the steel joists.  We also spent time organizing our stored materials so that the cellar walls could be started.  As I continue to create spaces and use materials,  this will get easier,  but right now we still end up moving materials back and forth to keep them out of the way of what ever we are doing!

On Thursday I met with the fabricators of the structural steel posts that will be part of the support system for the floors above.  I also had a good meeting with the folks at Precise Air,  the company that will be doing our Heating and air conditioning systems.  We hammered out some important details,  then I headed back to the lot.  That afternoon,  the steel joists were delivered, and by the end of that day we had placed all of the longest joists up on the shoring.

By Friday morning we had all of the joists in place and started setting the AmDeck.  The Amdeck has worked wonderfully.  It is actually fun to place an entire floor in a few hours! I simply sit up on the shoring and one of my helpers tosses up each piece from the ground.  I set it in place, and catch the next one.  It's that easy!  

By the end of the day I was able to stand on the floor of our future Master Bedroom and look out at the sunset!  
Next week we will finish the forming and set the steel posts in place.  Then we will get the cellar walls going.  There is a fair amount of rebar to do also.  Luckily,  the weather looks good for a full week of progress!

Wednesday, January 23, 2008

Living-room Walls

Now that I have a nice level slab, laying out the walls was pretty easy. First, I drew chalk lines where the walls should be, then screwed steel channel down to the slab. The ICFs fit into the channel, keeping the wall straight and preventing the ICFs from moving around. After the first course of blocks were set, the rest went up pretty easily. After each course of ICF, rebar is laid in the webs then the next course is installed, and so on.

As the walls were going up,  I started building the shoring that would brace the walls and support the next floor above.  
By the end of the 4th day,  the walls were 8 feet high,  and the openings for the french doors,  small window, and the fireplace were created.  I'm having to wait for another rain storm to pass, so I'm taking the opportunity to order the steel posts and joists for the upper floors. Hopefully, the walls will be done by the end of the week,  weather permitting!

On Tuesday the majority of the AmDeck forms were delivered.  It took 3 trucks to bring them here,  and they completely filled the garages!  There are still almost 200 blocks to bring,  but I asked the company to hold them for a bit so I could make some room!

Thursday, January 17, 2008

4 Floors, Done!

Finally,  after weeks of planning,  The day of the Big Pour arrived!  Both inspections went well the week before,  and I worked most of the weekend doing the final details on the forms.  

Because I decided to do all 4 of these levels at the same time,  the form work was very complex.  Not only were there the transitions between levels,  there were curved sections and custom beams that support various parts of the floor.  

Even with all the time I put in,  there were still things to do as the trucks started rolling up and the concrete started pumping!   

The footings in the back of the living room took almost 2 full trucks of concrete alone!   

After the living room footing was filled,  the cellar footing and slab was done.  

Next,  the walls supporting the foyer and the foyer slab were poured.

Finally, the walls supporting the living room and the living room slab were poured.



In total,  72 cubic yards in 8 trucks were poured.  The 4 finishers stayed all day,  and did a really nice job!

Here's a little video of the action!



Next,  the living room walls start going up!



Sunday, January 6, 2008

Almost ready for a Big Pour!

We had a great wind storm, much stronger than I thought! It actually blew the plastic that I had draped over the cut slopes all the way up and over the top fence!



In the weeks between Thanksgiving and Christmas we finished the Amdeck floor forms for the living-room and foyer, and started lay in the steel reinforcement.  And there is a LOT of it!

At the front of the livingroom,  there is a very strong reinforced beam. This beam spans the width of the garage below,  and supports the 2 story high front wall of the house.  Also visible is the AmDeck floor forms and the steel joists that support it.

Just before the Christmas Break,  the majority of the forming was done, and most of the steel was placed.  I was finally able to make a list of things to do on one page!   

This view shows the Living-room floor which is partially on grade and partially suspended on the AmDeck.  The round foyer is also visible in the center of the picture.

From the top of the cut,  the entire building site is visible, as well as my stockpile of ICFs waiting to be used!


After Christmas Break,  it was back to the forming details!  A full week of working on the items on my to-do list,  and it wasn't getting much shorter!  Many of the items were for complex forming connections that needed to be figured out,  and that took a lot of time.   Just before the New Years holiday,  I had the Structural Observation inspection of the steel reinforcement. There was a lot to look at,  and I passed!  That was a nice way to end 2007!    

It was a short week to start 2008.  The first 2 days were spent whittling down my to-do list,  it is getting shorter!

At the end on this week we were threatened with a triple rain storm,  the worst since 2005.  

I fixed the plastic I had hung earlier,  and added another 200 square feet,  mostly covering the lower cuts and some of the forms.

It's a bit surreal now with my white foam house rising up from a black plastic hole in the ground!
The storm hit as expected,  but not quite as strong as they were warning.  It started raining Friday and has rained every night this weekend,  but as of Sunday afternoon,  everything looks OK.  I went up and sump pumped the trenches during a break in the rain,  and other than some of the plastic tearing where water had gathered into puddles,  and a lot of mud backing up behind my sandbag dams,  I think we will come through the storm pretty well.  Now I just need to dry it out,  and do the final touches and get my city inspection so I can POUR!

Saturday, December 8, 2007

Catching up!

It's been quite a while since the last update! 

Since I last wrote,  a city crew came and re-finished the temporary patch over the water meter connection.  It was fun to watch these 2 men very efficiently do this job,  and finish it so well!

      
 
During the holiday breaks Kyle and his friend Austin helped out quite a bit.  It was great having these 2 young, energetic helpers!  I think they had a good time working together,  and hopefully learned a lot!  Here is Kyle helping to build the forms.


I was a bit too optimistic when I wrote that I might be able to pour after Thanksgiving!  This stage of construction has taken longer than I expected,  because it is very complex.  
I decided to prepare for one large pour,  one that would include the cellar footing and slab,  the foyer slab and the living-room slab,  as well as the stem walls that support these levels.  The 3 different floor levels involve a lot of custom forming,  and a very complex system of reinforcement.   


At the back of the garage where I did the slump backfill,  I built a removable form for the stem-wall that runs down the middle of the living-room.  It also supports the Am-Deck that forms the suspended portion of the living-room floor.

This view from the garage roof shows the Amdeck section built over the crawl-space. The floor will continue forward over the garage.  

We have now entered the rainy season,  and even though Southern California is in the middle of a record drought,  I still needed to protect my temporary cuts from rain.  The light plastic I had put up before was getting torn apart by the wind, so I spent the time and $$ to use the heavier 6 mil black plastic.

Just in time!  We got a good rain storm soon after I put the plastic up!  In addition to the plastic on the excavations,  I lined the street fence with a dam of sandbags to prevent any dirt from washing into the public right-of-way.

In the next entry,  I will finally be caught up!  I'll really try not to get so far behind again!  

Friday, November 16, 2007

Cellar Steel

A lot of steel was set this week! The cellar level footings were completed, and the footings under the middle of the living-room floor were poured so that I could start building up the support walls.


First, the cellar. This level is mostly underground, so almost every wall is a retaining wall. This means that the footing for this level is another hefty one! I will also be using a different technology for some of the walls to save space. More on this in later entries.


I've started all of the walls supporting the front of the living-room and the living-room deck. Also visible here is the concrete pour behind the garage that includes the living-room intermediate footing and the bases for the posts.


The wall at the upper left of this photo is the front edge of the living-room deck. About 6 feet to the right where the ICF block steps down is the front of the living-room, which extends from there to the cliff on the right of the picture.


The 4 steel cages for the support columns are visible in the picture below. I poured the base for the columns so that I could take away the supports and set the sonotube forms in place. The lower columns go up to the foyer floor level, the tall one at the bottom of the picture goes up to the dining-room floor level.


Next week will be a short one, but I hope to install the forms and shoring for the living-room floor and set all of the steel for the living-room footings. If all goes well I should be able to pour the livingroom and cellar floors right after Thanksgiving Break!

Happy Thanksgiving to All!

Saturday, November 3, 2007

Cellar Footings, continued...

This week we ALMOST finished the Cellar footing excavation!


For most of the week I rented a jackhammer to cut the "key" of the footing. this is the deepest narrow trench at the bottom that locks the footing into the rock. The jackhammer broke out the rock and laborers shoveled it out. In addition to the keys, we also cut the bases for concree columns that will support the central tower all the way to the roof. The columns are 18" in diameter, with a large square base set in the rock.


After the bulk of the rock was removed, there was a lot of "fine-tuning" to do. All measurements were double checked, and details were cut by the smaller impact hammer, actially a roto-hammer that can have the "roto" part turned off. Because of the limited access, this footing and all future footings for this project are being done by hand-held equipment, and the dirt is carried out by wheelbarrow and bucket to the front of the garage to be removed. This week Mike came back and took yet another 4 truck loads away!

After weeks of renting a jack hammer, I finally broke down and bought my own!


It's is GREAT! I don't know why I waited! I found a website (TYLERTOOL.com) that sold me a factory reconditioned Makita for almost half the price, and it cost me about the same as renting for 9 days! By the end of next week I will have broken even! Not only will it save money, but it is really perfect for the job. The rentals were either too large (90 lb. or not large enough (25 lb.) My Makita is 35 lb. and so far has done the job admirably!

Also this week, the steel was delivered for the cellar and livingroom floors. I had the column steel pre-fabricated, and they are very well done!



Next week, we finish the cuts and lay the steel!